RAIL: Greater Anglia Norwich-Cambridge
Delays of up to 15 minutes on the Norwich to Cambridge line. Owing to a problem at a level crossing between Shippea Hill and Thetford, trains have to run at reduced speed.
Delays of up to 15 minutes on the Norwich to Cambridge line. Owing to a problem at a level crossing between Shippea Hill and Thetford, trains have to run at reduced speed.