Turbine installed on River Wear

A twenty tonne water turbine is to be installed today in the Freeman's Reach area of Durham City. The 13 metre long Archimedian screw will make the site the first city centre development in the UK to incorporate a hydro-turbine generator.

It will get its energy from the River Wear and supply 75% of the energy required by the development.