Dawlish railway line won't be fully fixed until mid-April

The railway line at Dawlish in Devon, which was heavily damaged by the recent storms, is unlikely to be completely repaired until mid-April, Network Rail says.

Sections of the track were left exposed and hanging Credit: Ben Birchall/PA Wire

Rail services in the south west suffered significant disruption as a result of the damage.

Read: Huge waves damage railway line in Dawlish

Advertisement

Today's top stories